How a job runs

Five phases, and you'll know which one you're in.

From the first walkthrough to the last punch-list item, here's the whole sequence, with the timeframes we actually hit, including the two phases that are mostly waiting.

See all five phases

The full sequence

Five is the cap.

Every job we take runs through the same five phases, in the same order. No shop adds a sixth one halfway through.

  1. Within a week of your call · 60–90 minutes

    Walkthrough & honest first read

    We walk the space with you, and open a wall if opening a wall is the only way to know what's inside it. You leave with a rough range and a straight answer about whether we're the right shop for the job.

    • We walk the space, room by room
    • We open what needs opening to see what’s really there
    • You get a rough range and a plain yes-or-no on fit
  2. 2–4 weeks for kitchens and baths · 6–10 weeks for additions and ADUs

    Drawings & the fixed price

    Measured drawings, selections, and structural engineering where the job calls for it. Then one line-item, fixed-price quote with a start date and an end date on it. Nothing gets demolished before that number exists.

    • Measured drawings and material selections
    • Structural engineering, if the job needs it
    • One fixed-price quote, in writing, before demo

    See what each of the four jobs usually includes →

  3. 3–12 weeks, mostly out of our hands and entirely our problem

    Permits & prep

    We pull the permits, book the inspections, and use the wait to order long-lead material so week one isn't spent standing around. Dust walls go up and the dumpster gets placed where it won't own your driveway.

    • Permits pulled, inspections booked
    • Long-lead material ordered during the wait
    • Dust walls up, floors covered, site staged
  4. Baths 3–4 weeks · kitchens 5–7 · additions and ADUs 16–24

    Build

    One crew lead, one phone number, and a plain-English update every Friday. Tools get packed down every evening, and inspections are scheduled ahead so nobody's waiting on a Tuesday.

    • One crew lead, one phone number
    • A plain-English update every Friday
    • Inspections scheduled ahead, not chased

    Every job gets the same crew discipline, whichever of the four it is. Three jobs that ran this way →

  5. About a week

    Punch list & handover

    We walk the job with you and write the punch list together before the final payment, not after. You get the binder: manuals, warranty cards, paint codes, and a photocopy-simple map of every shutoff we touched.

    • Punch list written together, before final payment
    • A binder of manuals, warranty cards, and paint codes
    • A simple map of every shutoff we touched

Book the first walkthrough →

The studio

A small shop, on purpose.

Four crews run about fourteen jobs a year, out of the same shop on Gladstone Street since 2009. The lead who quotes your job is named in your contract, and is the one standing in your kitchen, not a rotating cast of subs or an account manager relaying messages from someone you've never met.

We turn down more work than we take. It's the only way the calendar stays honest, and the only way four leads can keep running these same four project types well enough to stop surprising themselves.

Because the drawings and the build come out of the same company, there's nobody to blame at week nine, and nobody billing you for the confusion.

After handover

We come back. Twice, without being asked.

The warranty is on the calendar from day one.

  1. The 30-day check

    The settling stuff: a door that's moved, a caulk line that's opened up. We come back and close it out.

  2. The 11-month check

    Timed to land before the first anniversary, while there's still time to fix anything before a manufacturer's clock runs out.

  3. The 2-year workmanship warranty

    In writing, covering our work. If it's a manufacturer's part, we chase the manufacturer for you.

OR CCB #204873 · licensed, bonded and insured.

Straight answers

The four questions everyone asks by the end.

Can we live in the house during the work?

Usually yes for a kitchen or an addition, and we build a temporary kitchen. For a house’s only bathroom, plan on nine days of hardship, not four weeks.

How far out are you booking?

Typically 3–5 months for kitchens and baths, 6–9 for additions and ADUs. If we can't start within six months we'll say so rather than hold your calendar.

Will you build our architect's drawings?

Happily. We'll price them as drawn and flag anything we think will cost you money later.

What actually changes the price?

You do. Change orders come from a decision you make, get priced in writing before the work happens, and we've never once billed for something we should have seen at the walkthrough.

Free estimate

Phase one takes ninety minutes.

We call within one business day to book the walkthrough. You'll get a straight answer on cost and timeline.

(503) 555-0114

Or email hello@hearthline.example.